Source:http://linkedlifedata.com/resource/pubmed/id/15691201
Switch to
Predicate | Object |
---|---|
rdf:type | |
lifeskim:mentions | |
pubmed:issue |
12
|
pubmed:dateCreated |
2005-2-4
|
pubmed:abstractText |
The proposed transfer of wastewater from the western part of Warsaw, across the Wisla (Vistula) River for joint treatment at the existing eastern side "Czajka" wastewater treatment plant (WWTP) will result in combined winter flows of approx. 580,000 m3 d(-1). One-year of pilot-scale studies defined the COD characteristics and kinetics of nitrogen removal and VFA production from primary sludge. BioWin simulation was used to size and price the optional processes and pointed to the Westbank process as the most cost-effective. The process consists of a sequence of a RAS pre-denitrification zone followed by an anaerobic, anoxic and aerobic zone. Some 100-150 t d(-1) of 10% methanol would be needed to remove 2-4 mg l(-1) of NO3-N above the recommended effluent level TN = 10 mg l(-1). Applying the principle of annual average 80% TN removal, and allowing for use of daily composite samples (rather than grab) could annually save the municipality over 1.5 million Euro on external carbon source.
|
pubmed:language |
eng
|
pubmed:journal | |
pubmed:citationSubset |
IM
|
pubmed:chemical | |
pubmed:status |
MEDLINE
|
pubmed:month |
Dec
|
pubmed:issn |
0959-3330
|
pubmed:author | |
pubmed:issnType |
Print
|
pubmed:volume |
25
|
pubmed:owner |
NLM
|
pubmed:authorsComplete |
Y
|
pubmed:pagination |
1405-11
|
pubmed:dateRevised |
2007-3-21
|
pubmed:meshHeading |
pubmed-meshheading:15691201-Bioreactors,
pubmed-meshheading:15691201-Calibration,
pubmed-meshheading:15691201-Computer Simulation,
pubmed-meshheading:15691201-Feasibility Studies,
pubmed-meshheading:15691201-Nitrogen,
pubmed-meshheading:15691201-Oxygen,
pubmed-meshheading:15691201-Phosphorus,
pubmed-meshheading:15691201-Pilot Projects,
pubmed-meshheading:15691201-Poland,
pubmed-meshheading:15691201-Sewage,
pubmed-meshheading:15691201-Waste Disposal, Fluid
|
pubmed:year |
2004
|
pubmed:articleTitle |
Feasibility studies and pre-design simulation of Warsaw's new wastewater treatment plant.
|
pubmed:affiliation |
Department of Civil Engineering, University of Manitoba, Winnipeg, Canada R3V 1T9.
|
pubmed:publicationType |
Journal Article,
Comparative Study
|